See Adopted Tipton Area Action Plan for further details.Local Policy TIP1. Alexandra Road/Upper Church
Lane/Locarno Road
Primary allocation: Residential, incorporating new Community
Open Space.
The development should be a phased comprehensive scheme in accordance with the
Council’s key design principles.
Estimated capacity: approximately 440 dwellings (net) allowing for approximately
1.5 hectares of open space on-site.
Proposals should include the provision of affordable housing on-site in
accordance with the Council’s needs assessment; based on the estimated capacity
and current housing needs assessment this is estimated at 110 dwellings.
Contributions may be required for the balance of open space and play provision,
the balance of affordable housing, and local education provision. Consideration
will be given to whether a contribution is necessary for sports or community
provision.
The need for transportation improvements will be determined following a
Transportation Assessment submitted at planning application stage.
Opportunities to remove Tipton Brook from culvert should be explored within the
new Community Open Space to create a more naturalised channel, which would also
become the functional floodplain. No residential development will be allowed
within the functional floodplain. Development within Flood Zones 2 (Medium
Probability) or 3a (High Probability) will only be allowed where a site-specific
Flood Risk Assessment demonstrates that satisfactory remedial measures,
including Sustainable Urban Drainage Systems, can be taken.
Local Policy TIP2. Central Avenue (the existing
Summerhill Primary School).
Primary allocation: Residential.
The development should be predominantly two storey family housing in keeping
with adjacent dwellings.
Estimated capacity: approximately 40 dwellings (net).
Affordable housing requirement on-site based on the estimated capacity and
current housing needs assessment: 10.
Contributions are required for open space and play provision and local education
provision. Consideration will be given to whether a contribution is necessary
for sports or community provision.
Transportation improvements will be determined following any Transportation
Assessment which may have to be submitted at planning application stage.
Local Policy TIP3. Upper Church Lane (formerly Tipton
Westminster School).
Primary allocation: Education.
Local Policy TIP4. Upper Church Lane/Moat Road (Premier Steel).
Primary allocation: Residential
The development should be predominantly two storey family housing in keeping
with adjacent dwellings.
Estimated capacity: approximately 80 dwellings (net).
Affordable housing requirement on-site based on the estimated capacity and
current housing needs assessment: 20.
Contributions are required for open space and play provision and local education
provision. Consideration will be given to whether a contribution is necessary
for sports or community provision.
Transportation improvements will be determined following any Transportation
Assessment which may have to be submitted at planning application stage.
Local Policy TIP5. Tibbington Open Space and Playing Fields.
Primary allocation: Community Open Space, including a Site of Interest for
Nature Conservation (SINC) and a Site of Local Interest for Nature Conservation
(SLINC).
Local Policy TIP6. Land at Tibbington Terrace (former Princes End Primary
School).
Primary allocation: Residential.
The development should be two storey with active frontages to Tibbington
Terrace, and overlooking The Cracker.
Estimated capacity: approximately 37 dwellings (net).
Affordable housing requirement on-site based on the estimated capacity and
current housing needs assessment: 9
Contributions are required for open space and play provision and local education
provision. Consideration will be given to whether a contribution is necessary
for sports or community provision.
Transportation improvements will be determined following any Transportation
Assessment which may have to be submitted at planning application stage.
Local Policy TIP7. Bradleys Lane/High Street.
Primary allocation: Mixed Use; Residential and Employment (B1(b) & (c), B2).
Site size: approximately 5.60 hectares.
Estimated capacity: approximately 230 dwellings (net), allowing for
approximately 1 hectare of employment uses.
Affordable housing requirement on-site based on the estimated capacity and
current housing needs assessment: 58.
Contributions may be required for the balance of open space and play provision,
the balance of affordable housing, and local education provision. Consideration
will be given to whether a contribution is necessary for sports or community
provision.
The need for transportation improvements will be determined following a
Transportation Assessment submitted at planning application stage.
|